{"id":6529,"date":"2019-12-04T10:39:03","date_gmt":"2019-12-04T16:39:03","guid":{"rendered":"https:\/\/www.wisconsin.edu\/procurement\/?p=6529"},"modified":"2019-12-04T10:46:38","modified_gmt":"2019-12-04T16:46:38","slug":"qa-for-kinesiology-relocation-posted","status":"publish","type":"post","link":"https:\/\/www.wisconsin.edu\/procurement\/2019\/12\/04\/qa-for-kinesiology-relocation-posted\/","title":{"rendered":"Q&amp;A for Kinesiology Relocation Posted"},"content":{"rendered":"<p>Is all abatement work done by the state\u2019s abatement contractor?<\/p>\n<ul>\n<li>The majority of the abatement will be done under separate contract prior to the General Prime Contractor (GPC) arrival.\u00a0 As detailed in the documents, the GPC will be responsible for abatement where they are required to connect to existing systems.\u00a0 Please see Addendum 7, specification section 02 82 13 (specifically page 1 and 2) for estimates of that work.<\/li>\n<\/ul>\n<p>What is the amount of pipe and duct asbestos removal work in the General Prime Contractor\u2019s scope of work?<\/p>\n<ul>\n<li>Page 1 and 2, specification section 02 82 13 of Addendum 7, provide estimates for the quantities to be removed.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Is all abatement work done by the state\u2019s abatement contractor? The majority of the abatement will be done under separate contract prior to the General Prime Contractor (GPC) arrival.\u00a0 As detailed in the documents, the GPC will be responsible for abatement where they are required to connect to existing systems.\u00a0 Please see Addendum 7, specification [&#8230;]<\/p>\n","protected":false},"author":1933,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6529","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/posts\/6529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/users\/1933"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/comments?post=6529"}],"version-history":[{"count":2,"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/posts\/6529\/revisions"}],"predecessor-version":[{"id":6531,"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/posts\/6529\/revisions\/6531"}],"wp:attachment":[{"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/media?parent=6529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/categories?post=6529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wisconsin.edu\/procurement\/wp-json\/wp\/v2\/tags?post=6529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}